{"id":1747,"date":"2026-05-29T03:27:43","date_gmt":"2026-05-29T00:27:43","guid":{"rendered":"https:\/\/svaroglaw.com\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/"},"modified":"2026-07-14T10:40:50","modified_gmt":"2026-07-14T07:40:50","slug":"dozvil-na-budivnycztvo","status":"publish","type":"page","link":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/","title":{"rendered":"Planning permission"},"content":{"rendered":"<p>The most costly mistake a developer can make is to start work without the necessary documents and then try to \u2018regularise\u2019 them. A property built without authorisation to carry out construction work is considered unauthorised construction (Article 376 of the Civil Code), with all the consequences that entails: it will not be commissioned, registered or permitted to be sold, and a court may order its demolition.<\/p>\n<p>That said, a building permit is <strong>not always<\/strong> required. For a detached house, a <strong>notification of the commencement of construction works<\/strong> is sufficient \u2014 this is a different, much simpler procedure. Confusion between a \u2018notification\u2019 and a \u2018permit\u2019 is the main cause of unnecessary delays.<\/p>\n<p>We process documents via the Unified State Electronic System for Construction and appeal against refusals by the State Inspectorate for Architecture and Urban Planning (DIAM).<\/p>\n<p><strong><a href=\"tel:380955545424\">+38 095 554-54-24<\/a> \u2014 legal advice<\/strong><\/p>\n<h2>The complexity category determines everything<\/h2>\n<p>It determines which document you need, whether a project assessment is required, and how long the procedure will take.<\/p>\n<table>\n<tbody>\n<tr>\n<th>Category<\/th>\n<th>What this usually involves<\/th>\n<th>Document to commence works<\/th>\n<th>Document upon completion<\/th>\n<\/tr>\n<tr>\n<td><strong>CC1<\/strong> \u2014 minor consequences<\/td>\n<td>Detached houses, outbuildings, small-scale projects<\/td>\n<td>Notification of the commencement of construction works<\/td>\n<td>Declaration of readiness for use<\/td>\n<\/tr>\n<tr>\n<td><strong>SS2<\/strong> \u2014 moderate impact<\/td>\n<td>Multi-occupancy blocks, most commercial premises<\/td>\n<td>Permit to carry out construction works<\/td>\n<td>Certificate of acceptance into service<\/td>\n<\/tr>\n<tr>\n<td><strong>SS3<\/strong> \u2014 significant consequences<\/td>\n<td>Complex and potentially hazardous facilities<\/td>\n<td>Permit for construction works<\/td>\n<td>Certificate of acceptance into service<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The category is not determined by the developer \u2018by eye\u2019, but by the designer \u2014 based on the property\u2019s characteristics. Under-classifying a property to take the easy way out results in the documents being revoked and the property being classified as unauthorised construction.<\/p>\n<h2>What is required before submission<\/h2>\n<p>These are the first things to be checked, and they are the ones where people most often \u2018stumble\u2019:<\/p>\n<p><strong>Right to the land plot.<\/strong> Ownership, lease, superficies \u2014 but the right must be registered. Construction without a right to the land cannot be authorised in principle.<\/p>\n<p><strong>Intended use.<\/strong> A plot designated \u2018for horticulture\u2019 does not permit the construction of a residential building with registered residence. Sometimes you have to change the designated use first \u2014 and this is a separate procedure taking several months.<\/p>\n<p><strong>Town planning conditions and restrictions (TPCs)<\/strong> \u2014 for developments where they are required. Issued by the town planning authority; a refusal can be appealed.<\/p>\n<p><strong>Building passport<\/strong> \u2014 for individual developments, this is often the main document defining the parameters of the future house.<\/p>\n<p><strong>Project documentation<\/strong>, and for SS2 and SS3 \u2014 also <strong>project expert review<\/strong>.<\/p>\n<p><strong>Technical supervision and designer supervision<\/strong> \u2014 mandatory for properties in the relevant categories.<\/p>\n<p><a href=\"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/07\/dozvil-na-budivnycztvo-infografika.svg\"><img decoding=\"async\" class=\"alignnone size-full wp-image-3741\" src=\"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/07\/dozvil-na-budivnycztvo-infografika.svg\" alt=\"Building permit: complexity categories CC1, CC2, CC3 and the required documents\" \/><\/a><\/p>\n<h2>Restrictions people only find out about too late<\/h2>\n<ul>\n<li><strong>Protection zones<\/strong> \u2014 power lines, gas pipelines, water mains. Building within these zones is prohibited, and no permit will change that.<\/li>\n<li><strong>Coastal protection zones<\/strong> \u2014 a classic pitfall for plots near the water.<\/li>\n<li><strong>Airfield vicinity<\/strong> \u2014 a separate approval procedure that can completely block a project.<\/li>\n<li><strong>Cultural heritage sites and their protection zones<\/strong> \u2014 additional approvals are required.<\/li>\n<li><strong>Setbacks from the boundaries of neighbouring plots<\/strong> \u2014 breaching the State Building Regulations (DBN) here means a future dispute with a neighbour and refusal to grant a commissioning certificate.<\/li>\n<\/ul>\n<p>Therefore, a legal audit of the plot <strong>before<\/strong> purchase and <strong>before<\/strong> commissioning the project is the cheapest investment in the entire process.<\/p>\n<h2>If DIAM has refused<\/h2>\n<p>The refusal must be <strong>in writing and substantiated<\/strong>. Next:<\/p>\n<ul>\n<li><strong>rectify the shortcomings<\/strong> if the reason is procedural \u2014 an incomplete application, errors in the documents;<\/li>\n<li><strong>appeal<\/strong> if the refusal is unlawful. This is an administrative claim; the court may order the authority to register the notification or issue the permit.<\/li>\n<\/ul>\n<p>Failure to act (documents submitted, deadline passed, no decision) is appealed in the same way.<\/p>\n<p>Separately: <strong>suspension of construction<\/strong> by order of the State Architectural and Urban Planning Inspectorate (DIAM) and the imposition of a fine. Speed is of the essence here \u2014 both in appealing the order and in simultaneously rectifying the breaches, if they actually exist.<\/p>\n<h2>When a solicitor is not needed<\/h2>\n<p>If the plot is yours, the designated use is correct, the building is standard (SS1), and the designer is competent \u2014 the procedure can be completed without a solicitor. We will state this clearly.<\/p>\n<p>You need a solicitor when:<\/p>\n<ul>\n<li><strong>DIAM has refused<\/strong> or has not responded;<\/li>\n<li>construction <strong>has been halted by an order<\/strong>, and a fine has been imposed;<\/li>\n<li><strong>the designated use<\/strong> of the plot does not permit building;<\/li>\n<li>the plot falls within <strong>a conservation area<\/strong> or is subject to restrictions;<\/li>\n<li><strong>neighbours are challenging<\/strong> your planning permission;<\/li>\n<li>you are purchasing a plot <strong>for development<\/strong> and wish to know whether building on it is permitted at all;<\/li>\n<li>work <strong>has already begun without the necessary documentation<\/strong>.<\/li>\n<\/ul>\n<h2>How we work<\/h2>\n<ol>\n<li><strong>Legal audit of the plot<\/strong> \u2014 legal status, designated use, restrictions, conservation areas. Before the project, not after.<\/li>\n<li><strong>We determine the procedure<\/strong> \u2014 notification or permission, whether a municipal planning authority decision or a building passport is required.<\/li>\n<li><strong>We assist with submissions<\/strong> via the e-system.<\/li>\n<li><strong>We challenge refusals and orders<\/strong> from the State Architectural and Urban Planning Inspection (DIAM) in the administrative court.<\/li>\n<li><strong>We handle disputes with neighbours<\/strong> and local authorities.<\/li>\n<li><strong>We see the project through to commissioning<\/strong> and registration of ownership rights.<\/li>\n<\/ol>\n<h2>Cost of services<\/h2>\n<table>\n<tbody>\n<tr>\n<th>Service<\/th>\n<th>Price<\/th>\n<\/tr>\n<tr>\n<td>Consultation<\/td>\n<td>from 1,500 UAH<\/td>\n<\/tr>\n<tr>\n<td>Legal audit of the plot prior to construction<\/td>\n<td>from 5,000 UAH<\/td>\n<\/tr>\n<tr>\n<td>Support with the preparation of construction documentation<\/td>\n<td>from 5,000 UAH<\/td>\n<\/tr>\n<tr>\n<td>Preparation of a statement of claim and procedural documents<\/td>\n<td>from 5,000 UAH<\/td>\n<\/tr>\n<tr>\n<td>Participation in one court hearing<\/td>\n<td>from 3,000 UAH<\/td>\n<\/tr>\n<tr>\n<td>Legal representation in court<\/td>\n<td>from 10,000 UAH<\/td>\n<\/tr>\n<tr>\n<td>Comprehensive support for administrative proceedings (appeal against a refusal by the State Architectural and Urban Planning Inspectorate)<\/td>\n<td>from 30,000 UAH<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>The following are charged separately:<\/strong> project documentation, project expert assessment, technical supervision, extracts from registers, court fees.<\/p>\n<p><a href=\"https:\/\/svaroglaw.com\/en\/cziny-poslug\/\">Full price list<\/a> \u00b7 <a href=\"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/uzakonennya-zhytlovyh-budynkiv\/\">Legalisation of residential buildings<\/a><\/p>\n<h2>Questions and answers (Building permit)<\/h2>\n<h3>Is a building permit required for a private house?<\/h3>\n<p>Usually not. Detached houses fall under category CC1 \u2014 a notification of the start of construction works is sufficient. A permit is required for CC2 and CC3 properties.<\/p>\n<h3>What happens if you build without the necessary documents?<\/h3>\n<p>The property will be deemed unauthorised construction (Article 376 of the Civil Code): it will not be commissioned, ownership will not be registered, and a court may order it to be demolished at your expense.<\/p>\n<h3>Is it possible to build on a allotment?<\/h3>\n<p>A garden house \u2014 yes. A residential property, with registration of residence \u2014 generally speaking, no. A change of designated use is required, and this is not always possible.<\/p>\n<h3>DIAM has refused. What should I do?<\/h3>\n<p>Request a written, reasoned refusal. If the reason is a technicality, rectify the shortcomings. If the refusal is unlawful, appeal to the administrative court; the court may order the authority to issue the document.<\/p>\n<h3>What should I do if construction has been halted by an order?<\/h3>\n<p>Act quickly: challenge the order and, at the same time, rectify any breaches, if they actually exist. Delaying the process increases both the fine and the risk of demolition.<\/p>\n<h3>Is it possible to obtain the necessary permits once construction has already begun?<\/h3>\n<p>Yes, but this amounts to legalising unauthorised construction \u2014 a longer and more expensive procedure than obtaining permits before work begins.<\/p>\n<h3>How long does the registration process take?<\/h3>\n<p>A notification (SS1), provided all documents are in order, takes a few weeks. A permit for SS2\/SS3, including the project and expert assessment, takes several months. Changing the designated use of the plot adds a further 3\u20136 months.<\/p>\n<h3>What documents should I bring to the consultation?<\/h3>\n<p>Documents relating to the plot of land, a cadastral extract, town planning conditions or a building passport (if available), the project, and any refusal or order from the State Architectural and Urban Planning Inspectorate (DIAM).<\/p>\n<h2>Consulting a solicitor regarding a building permit with the firm \u2018Svarog\u2019<\/h2>\n<p>Send us the plot\u2019s cadastral number \u2014 we\u2019ll check whether building is permitted on it, what restrictions apply, and which procedure you need: a notification or a permit. A check before work begins costs significantly less than legalising the situation afterwards.<\/p>\n<p><strong><a href=\"tel:380955545424\">+38 095 554-54-24<\/a><\/strong> \u00b7 Kyiv, 7 Khoriva St, Office 2 (Podil) \u00b7 Mon\u2013Fri 9.00\u201318.00<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The most costly mistake a developer can make is to start work without the necessary documents and then try to \u2018regularise\u2019 them. A property built without authorisation to carry out construction work is considered unauthorised construction (Article 376 of the Civil Code), with all the consequences that entails: it will not be commissioned, registered or [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1783,"parent":1737,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/with-sidebar.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1747","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Building permits \u2014 application process, complexity categories, solicitor, lawyer, fees<\/title>\n<meta name=\"description\" content=\"No planning permission is required for a private house (SS1) \u2014 a notification is sufficient. We will submit the documents via the online system and appeal against any refusal by DIAM.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Building permits \u2014 application process, complexity categories, solicitor, lawyer, fees\" \/>\n<meta property=\"og:description\" content=\"No planning permission is required for a private house (SS1) \u2014 a notification is sufficient. We will submit the documents via the online system and appeal against any refusal by DIAM.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/\" \/>\n<meta property=\"og:site_name\" content=\"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/svaroglawfirm\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-14T07:40:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/05\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@svaroglawfirm\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/\",\"url\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/\",\"name\":\"Building permits \u2014 application process, complexity categories, solicitor, lawyer, fees\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/svaroglaw.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg\",\"datePublished\":\"2026-05-29T00:27:43+00:00\",\"dateModified\":\"2026-07-14T07:40:50+00:00\",\"description\":\"No planning permission is required for a private house (SS1) \u2014 a notification is sufficient. We will submit the documents via the online system and appeal against any refusal by DIAM.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/#breadcrumb\"},\"inLanguage\":\"en-UA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-UA\",\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/svaroglaw.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg\",\"contentUrl\":\"https:\\\/\\\/svaroglaw.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg\",\"width\":1500,\"height\":1000,\"caption\":\"Construction plans with yellow helmet and drawing tools on blueprints\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/dozvil-na-budivnycztvo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Property solicitor\",\"item\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/advokat-z-neruhomosti\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Planning permission\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/\",\"name\":\"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-UA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/#organization\",\"name\":\"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433\",\"url\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-UA\",\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/svaroglaw.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ava-copy.png\",\"contentUrl\":\"https:\\\/\\\/svaroglaw.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ava-copy.png\",\"width\":700,\"height\":700,\"caption\":\"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433\"},\"image\":{\"@id\":\"https:\\\/\\\/svaroglaw.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/svaroglawfirm\",\"https:\\\/\\\/x.com\\\/svaroglawfirm\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/svaroglaw\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@svaroglaw\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Building permits \u2014 application process, complexity categories, solicitor, lawyer, fees","description":"No planning permission is required for a private house (SS1) \u2014 a notification is sufficient. We will submit the documents via the online system and appeal against any refusal by DIAM.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/","og_locale":"en_US","og_type":"article","og_title":"Building permits \u2014 application process, complexity categories, solicitor, lawyer, fees","og_description":"No planning permission is required for a private house (SS1) \u2014 a notification is sufficient. We will submit the documents via the online system and appeal against any refusal by DIAM.","og_url":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/","og_site_name":"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433","article_publisher":"https:\/\/www.facebook.com\/svaroglawfirm","article_modified_time":"2026-07-14T07:40:50+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/05\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@svaroglawfirm","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/","url":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/","name":"Building permits \u2014 application process, complexity categories, solicitor, lawyer, fees","isPartOf":{"@id":"https:\/\/svaroglaw.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/#primaryimage"},"image":{"@id":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/#primaryimage"},"thumbnailUrl":"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/05\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg","datePublished":"2026-05-29T00:27:43+00:00","dateModified":"2026-07-14T07:40:50+00:00","description":"No planning permission is required for a private house (SS1) \u2014 a notification is sufficient. We will submit the documents via the online system and appeal against any refusal by DIAM.","breadcrumb":{"@id":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/#breadcrumb"},"inLanguage":"en-UA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/"]}]},{"@type":"ImageObject","inLanguage":"en-UA","@id":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/#primaryimage","url":"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/05\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg","contentUrl":"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/05\/construction-plans-with-yellow-helmet-drawing-tools-bluep.jpg","width":1500,"height":1000,"caption":"Construction plans with yellow helmet and drawing tools on blueprints"},{"@type":"BreadcrumbList","@id":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/dozvil-na-budivnycztvo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/svaroglaw.com\/en\/"},{"@type":"ListItem","position":2,"name":"Property solicitor","item":"https:\/\/svaroglaw.com\/en\/advokat-z-neruhomosti\/"},{"@type":"ListItem","position":3,"name":"Planning permission"}]},{"@type":"WebSite","@id":"https:\/\/svaroglaw.com\/en\/#website","url":"https:\/\/svaroglaw.com\/en\/","name":"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433","description":"","publisher":{"@id":"https:\/\/svaroglaw.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/svaroglaw.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-UA"},{"@type":"Organization","@id":"https:\/\/svaroglaw.com\/en\/#organization","name":"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433","url":"https:\/\/svaroglaw.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-UA","@id":"https:\/\/svaroglaw.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/06\/ava-copy.png","contentUrl":"https:\/\/svaroglaw.com\/wp-content\/uploads\/2026\/06\/ava-copy.png","width":700,"height":700,"caption":"\u042e\u0440\u0438\u0434\u0438\u0447\u043d\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0421\u0432\u0430\u0440\u043e\u0433"},"image":{"@id":"https:\/\/svaroglaw.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/svaroglawfirm","https:\/\/x.com\/svaroglawfirm","https:\/\/www.linkedin.com\/company\/svaroglaw\/","https:\/\/www.youtube.com\/@svaroglaw"]}]}},"_links":{"self":[{"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/pages\/1747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/comments?post=1747"}],"version-history":[{"count":3,"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/pages\/1747\/revisions"}],"predecessor-version":[{"id":3744,"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/pages\/1747\/revisions\/3744"}],"up":[{"embeddable":true,"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/pages\/1737"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/media\/1783"}],"wp:attachment":[{"href":"https:\/\/svaroglaw.com\/en\/wp-json\/wp\/v2\/media?parent=1747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}